- Burlington Streets: Pine St (4X5's)
- Description
-
March 1, 1934. South End Sewer Project. Docket No. 2353 Burlington, Vermont. Men work after a heavy snowfall.
- Title
- Burlington Streets: Pine St.
- Description
-
September 18, 1942. Pine Street sewer project between Morse Place and Home Ave. This view shows the sewer trench with 10 inch tile installed from Morse Place to a point about mid-way of the block. The excavation the foreground is for the construction of the manhole at station 250 from the...
Show moreSeptember 18, 1942. Pine Street sewer project between Morse Place and Home Ave. This view shows the sewer trench with 10 inch tile installed from Morse Place to a point about mid-way of the block. The excavation the foreground is for the construction of the manhole at station 250 from the intersection of Home Ave. Note that sand filling is used for a cushion under the tile and for backfilling around the tile and for a depth of approximately one foot over the tile. This project is being done under our regular sewer appropriation. A trench hoe was used for digging the trench which was in clay and very tough hard-pan with numerous large boulders which had to be drilled and blasted. No solid rock was encountered.
Show less
- Title
- Burlington Streets: Proctor Place
- Description
-
June 13, 1935. Burlington, VT. V.E.R.A. Project No. 402-B7-15. Proctor Place sewer from Wright Ave. ravine sewer. Workmen stand above the ditch while others work in it.
- Title
- Burlington Streets: Prospect Street
- Description
-
February 13, 1935. V.E.R.A. (Vermont Emergency Relief Administration) Sewer Project looking north on Prospect Street. Excavation is through about 5 ft. of frost at this location.
- Title
- Burlington Streets: Prospect Street
- Description
-
January 23, 1935. In front of Dr. Marshall C. Twitchell's residence at 603 South Prospect Street. Note the solid rock which has been uncovered ready for drilling and blasting during sewer / road construction project.