Search results
(361 - 380 of 807)
Pages
- Title
- Burlington Streets: North Ave
- Description
-
Photograph dated Nov. 4, 1931, of the status of the paving and widening project on North Avenue, looking north beyond Lake View Cemetery towards the intersection with Institute Road.
- Title
- Burlington Streets: North Ave
- Description
-
Photograph dated June 4, 1934, looking south from the entrance of Lake View Cemetery. The Providence Orphan Asylum can be seen to the right through the trees. Original caption reads: P.W.A Project #2232 A view of North Avenue widening Project looking southerly from the northerly termination of...
Show morePhotograph dated June 4, 1934, looking south from the entrance of Lake View Cemetery. The Providence Orphan Asylum can be seen to the right through the trees. Original caption reads: P.W.A Project #2232 A view of North Avenue widening Project looking southerly from the northerly termination of Project. It shows the completed pavement with integral curb and gutter and increases the pavement width on an average of 12 Feet.
Show less
- Title
- Burlington Streets: North Ave
- Description
-
Photograph dated Aug. 4, 1931, showing a work crew removing debris during the project when the hill side north of Institute Road on North Avenue was scaled back.
- Title
- Burlington Streets: North Bend Street
- Description
-
January 20, 1944. NORTH BEND STREET SEWER CONSTRUCTION PROJECT. This view shows the intersection of North Bend Street in front of the Pomeroy "Stone" Cottage. This project extends from the intersection of Oak Street and North Bend northerly a distance of 110 feet to the intersection shown in the...
Show moreJanuary 20, 1944. NORTH BEND STREET SEWER CONSTRUCTION PROJECT. This view shows the intersection of North Bend Street in front of the Pomeroy "Stone" Cottage. This project extends from the intersection of Oak Street and North Bend northerly a distance of 110 feet to the intersection shown in the foreground, thence easterly a distance of 167 feet to the dead-end manhole. A new manhole and two catch basins and one manhole are to be constructed at this intersection. 15 inch clay sewer tile is being used in the first section and 10 inch clay sewer tile is being used in the second section. This installation will take care of the surface drainage which here-to-fore has overflowed down over the bank to the left, into the Intervale, but because of the new road now leading to the Refuse Disposal Grounds, this surface water would create severe damage to the road and adjoining banks. Note also the catch basin being constructed at the intersection of North Bend Street and Walnut Street shown in the background. The frost on this date was approximately 4 feet in depth.
Show less
- Title
- Burlington Streets: North Bend Street
- Description
-
May 23, 1942. This view shows the intersection of St. Louis Street and North Bend Street as excavation on the road to the proposed City Dump on the Intervale was being started Saturday morning May 23, 1942. The view is looking up an easterly direction along North Bend St. Note the location of the...
Show moreMay 23, 1942. This view shows the intersection of St. Louis Street and North Bend Street as excavation on the road to the proposed City Dump on the Intervale was being started Saturday morning May 23, 1942. The view is looking up an easterly direction along North Bend St. Note the location of the pole line and the large Elm tree in the approximate center line of the right-of-way.
Show less
- Title
- Burlington Streets: North Bend Street
- Description
-
July 26, 1945. North Bend Street Asphalt Pavement Project. This view taken from the intersection of Pitkin St. and Ward St. looking westerly shows the completed pavement after constructing a two inch hot-stone-filled-sheet asphalt-plant-mix wearing surface, over the new asphalt penetration base...
Show moreJuly 26, 1945. North Bend Street Asphalt Pavement Project. This view taken from the intersection of Pitkin St. and Ward St. looking westerly shows the completed pavement after constructing a two inch hot-stone-filled-sheet asphalt-plant-mix wearing surface, over the new asphalt penetration base and old surface as shown in Fig. 1.
Show less
- Title
- Burlington Streets: North Bend Street
- Description
-
October 19, 1938 repaving project by the Burlington city street dept on North Bend Street. This would later become Manhattan Drive.
- Title
- Burlington Streets: North Bend Street
- Description
-
This view shows the intersection of St. Louis Street and North Bend Street as excavation on the road to the proposed City Dump on the Intervale was being started Saturday morning May 23, 1942.
- Title
- Burlington Streets: North Bend Street
- Description
-
October 19, 1938. Intersection of No. Champlain and North Bend Street. Homes are seen on each side of the street. North Bend was later renamed Manhattan Drive.
- Title
- Burlington Streets: North Bend Street
- Description
-
May 23, 1942. This view shows the intersection of St. Louis Street and North Bend Street as excavation on the road to the proposed City Dump on the Intervale was being started Saturday morning May 23. This view is looking in a westerly direction along North Bend Road.
- Title
- Burlington Streets: North Bend Street
- Description
-
July 26, 1945. North Bend Street Asphalt Pavement Project. This view shows the completed pavement after constructing a two inch hot-stone-filled-sheet asphalt-Plant-mix wearing surface, over the new asphalt penetration and old surface as shown in Fig. 1.
- Title
- Burlington Streets: North Bend Street
- Description
-
July 12, 1945. North Bend Street Asphalt Pavement Project. This view taken from the intersection of Pitkin St. and Ward St. looking westerly shows the preparation of the crushed stone base on the northerly half of the street before receiving the asphalt penetration. Note the windrows of excavated...
Show moreJuly 12, 1945. North Bend Street Asphalt Pavement Project. This view taken from the intersection of Pitkin St. and Ward St. looking westerly shows the preparation of the crushed stone base on the northerly half of the street before receiving the asphalt penetration. Note the windrows of excavated material along the shoulder of the street back of the curb where it was pushed with the aid of a heavy duty power grader to eliminate hand labor and hauling off the job.
Show less
- Title
- Burlington Streets: North Bend Street
- Description
-
May 23, 1942. This view is taken from a point just westerly of the intersection of St. Louis St and North Bend St. on a line with the southerly shoulder of the proposed roadway to the City Dump looking in an easterly direction.
- Title
- Burlington Streets: North Bend Street
- Description
-
October 19, 1938. Crew of the city street dept repave and resurface a section of North Bend Street (that will later be renamed Manhattan Drive)
- Title
- Burlington Streets: North Bend Street
- Description
-
November 14, 1938. Burlington city street crew do road construction on North Bend Street (later renamed Manhattan Drive)
- Title
- Burlington Streets: North Bend Street
- Description
-
This view shows the entrance, to the proposed City Dump on the Intervale where it starts at the intersection of St. Louis Street and North Bend Street just as work was being started Saturday morning, May 23, 1942.
- Title
- Burlington Streets: North Bend Street
- Description
-
July 12, 1945. North Bend Street Asphalt Pavement Project. This view was taken from the intersection of Washington St. looking easterly. Note the old surface treated gravel pavement on the right half of this 26 foot pavement and the new 4 inch asphalt penetration crushed stone base being...
Show moreJuly 12, 1945. North Bend Street Asphalt Pavement Project. This view was taken from the intersection of Washington St. looking easterly. Note the old surface treated gravel pavement on the right half of this 26 foot pavement and the new 4 inch asphalt penetration crushed stone base being constructed on the left hand side bringing the surface of the base to the level of the old surface. A child can be seen taking a ride on the steam roller.
Show less
- Title
- Burlington Streets: North Bend Street
- Description
-
October 19, 1938. City street dept crew work on resurfacing the road.
- Title
- Burlington Streets: North Bend Street
- Description
-
August 15, 1939 PWA Project No. Vt. 1097-F This view shows the completed pavement at the intersection of North Bend Street and Ward Street. The old road bed was scarified, reshaped and treated with stabilizing emulsion late in the fall of 1938 and a base course of asphalt penetration was...
Show moreAugust 15, 1939 PWA Project No. Vt. 1097-F This view shows the completed pavement at the intersection of North Bend Street and Ward Street. The old road bed was scarified, reshaped and treated with stabilizing emulsion late in the fall of 1938 and a base course of asphalt penetration was constructed with one application of 85-100 penetration asphalt binder. A wearing surface of two inches of Plant-Max asphalt using tempering fluid was constructed during the early summer of 1939.
Show less
- Title
- Burlington Streets: North Street
- Description
-
Undated but may be August 1930. Looking East on North St at Rose St intersection before new construction work to resurface the road. Trolley (streetcar) tracks are seen running the center of the street. To the left is the I.G.A. stores at 144 - 146 North St.