Search results
(221 - 240 of 807)
Pages
- Title
- Burlington Streets: Intervale Rd.
- Description
-
November 26, 1928. Washout on Intervale Road caused by flood of Nov. 4, 1927 as it looked just before starting work of construction of new road Nov. 1928.
- Title
- Burlington Streets: Lake Street
- Description
-
May 8, 1936. Lake Street, WPA Project No. 65-12-336 looking South from intersection of Depot Street. This project consists of widening pavement to twenty four feet with Telford stone base construction, surfacing with a leveling course of penetration macadam varying in thickness from one to four...
Show moreMay 8, 1936. Lake Street, WPA Project No. 65-12-336 looking South from intersection of Depot Street. This project consists of widening pavement to twenty four feet with Telford stone base construction, surfacing with a leveling course of penetration macadam varying in thickness from one to four inches and constructing Hot Mix stone filled sheet asphalt wearing surface two inches in thickness. Local businesses of Shepard & Morse Lumber Co. and Wilson & Co., wholesale meats seen to the right. Railroad cars and tankers to the left.
Show less
- Title
- Burlington Streets: Lake Street
- Description
-
May 8, 1936. Lake Street, WPA Project No. 65-12-336 looking South from intersection of Depot Street. This project consists of widening pavement to twenty four feet with Telford stone base construction, surfacing with a leveling course of penetration macadam varying in thickness from one to four...
Show moreMay 8, 1936. Lake Street, WPA Project No. 65-12-336 looking South from intersection of Depot Street. This project consists of widening pavement to twenty four feet with Telford stone base construction, surfacing with a leveling course of penetration macadam varying in thickness from one to four inches and constructing Hot Mix stone filled sheet asphalt wearing surface two inches in thickness.
Show less
- Title
- Burlington Streets: Lake Street
- Description
-
Undated photo (1930s?) of Lake Street in Burlington. A view of the road repaving project looking north along its length from the intersection of College and Lake Street. To the right is Shepard & Morse Lumber Co., Inc (office 14 College St.). Further down is seen the Wilson & Co. sign for...
Show moreUndated photo (1930s?) of Lake Street in Burlington. A view of the road repaving project looking north along its length from the intersection of College and Lake Street. To the right is Shepard & Morse Lumber Co., Inc (office 14 College St.). Further down is seen the Wilson & Co. sign for wholesale meats. On the right is a railroad car. May be W.P.A. project No. 65-12-336 of 1936.
Show less
- Title
- Burlington Streets: Lake Street
- Description
-
1936 photo of W.P.A. project. View is of Lake Street as it runs along the railroad tracks and crossing. To the left appear to be old trolley car tracks. Further down partially seen is a sign for Burlington Lumber Co., Inc for lumber and building supplies.
- Title
- Burlington Streets: Lakeside Ave
- Description
-
December 5, 1945. City of Burlington, Vermont, Street Department. Lakeside Ave. Pavement Base Construction. This view was taken from a point near the intersection of Conger Ave. looking westerly toward the Lake Champlain. The new factory building just completed for the Blodgett Co. is shown with...
Show moreDecember 5, 1945. City of Burlington, Vermont, Street Department. Lakeside Ave. Pavement Base Construction. This view was taken from a point near the intersection of Conger Ave. looking westerly toward the Lake Champlain. The new factory building just completed for the Blodgett Co. is shown with parking area base recently constructed between the street line and the building. Note the asphalt emulsion stabilized base which was mixed the previous day before taking this picture. Cold weather and frost conditions had frozen the base mixture on the left half of the street but the job was continued on the north half in spite of the low temperatures as the street had to be put in condition to receive traffic for the winter, this street being on a regular bus line. The job was continued by placing a 2 inch layer of crushed stone on this stabilized base and penetrating the same with asphalt emulsion and covering with concrete sand as a "blotter" for the winter and then opened to traffic. This project will be continued to completion in the spring by constructing an integral concrete curb and gutter on the south side of a 3 inch hot plant mix wearing surface over the entire pavement area. Note the asphalt distributor applying emulsion and the tractor and harrow mixing the base.
Show less
- Title
- Burlington Streets: Lakeside Ave
- Description
-
December 5, 1945. City of Burlington, Vermont, Street Department Lakeside Ave. Pavement Base Construction This view was taken from a point near the intersection of Central Ave. looking easterly toward the underpass. The new factory building just completed for the Blodgett Co. is shown with...
Show moreDecember 5, 1945. City of Burlington, Vermont, Street Department Lakeside Ave. Pavement Base Construction This view was taken from a point near the intersection of Central Ave. looking easterly toward the underpass. The new factory building just completed for the Blodgett Co. is shown with parking area base recently constructed between the street line and the building. Note the asphalt emulsion stabilized base which was mixed the previous day before taking this picture. Cold weather and frost conditions had frozen the base mixture on the left half of the street but the job was continued on the north half in spite of the low temperatures as the street had to be put in condition to receive traffic for the winter, this street being on a regular bus line. The job was continued by placing a 2 inch layer of crushed stone on this stabilized base and penetrating the same with asphalt emulsion and covering with concrete sand as a "blotter" for the winter and then opened to traffic. This project will be continued to completion in the spring by constructing an integral concrete curb and gutter on the south side of a 2 inch hot plant mix wearing surface over the entire pavement area. Note the asphalt distributor applying emulsion and the tractor and harrow mixing the base.
Show less
- Title
- Burlington Streets: Lakeside Ave
- Description
-
December 11, 1945. City of Burlington, Vermont, Street Department. Lakeside Ave. Pavement Base Construction. This view was taken from a point near the intersection of Conger Ave. looking westerly towards the lake. Note that the temporary wearing surface had been constructed for the base after the...
Show moreDecember 11, 1945. City of Burlington, Vermont, Street Department. Lakeside Ave. Pavement Base Construction. This view was taken from a point near the intersection of Conger Ave. looking westerly towards the lake. Note that the temporary wearing surface had been constructed for the base after the work of mixing and stabilizing the base had been completed as shown in the picture under date Dec. 5, 1945. This stage of construction was done to enable the street to be used during the winter and early spring without experiencing the troubles of early spring break-up of the old dirt and cinder street. The pavement will be completed in the summer of 1946. Note the crushed stone base placed in the driveway after regrading to meet new grades.
Show less
- Title
- Burlington Streets: Lakeside Ave
- Description
-
Aug. 3, 1944. This view taken from Rutland Railroad tracks over underpass looking easterly on Lakeside Ave. shows condition of shoulder on outside of concrete pavement on the right where new concrete slab is to be constructed. Entrances to parking area will have to be recessed and old transformer...
Show moreAug. 3, 1944. This view taken from Rutland Railroad tracks over underpass looking easterly on Lakeside Ave. shows condition of shoulder on outside of concrete pavement on the right where new concrete slab is to be constructed. Entrances to parking area will have to be recessed and old transformer pole removed in foreground.
Show less
- Title
- Burlington Streets: Lakeside Ave
- Description
-
August 3, 1944. This view taken from the easterly side of Pine St. at the intersection of Lakeside Ave. shows the old 18 foot concrete pavement as it appeared on Aug. 3, 1944, before construction work began. The pole line on the left side of the pavement had just been reset to clear the center...
Show moreAugust 3, 1944. This view taken from the easterly side of Pine St. at the intersection of Lakeside Ave. shows the old 18 foot concrete pavement as it appeared on Aug. 3, 1944, before construction work began. The pole line on the left side of the pavement had just been reset to clear the center line of the pavement a distance of 26 feet, allowing for the proposed 12 foot shoulder. Note the stone monument in the foreground which marks the intersection of the center line of Pine St. and the center line of Lakeside Ave. This monument will be reset with a lamphole frame and cover for protection during construction work. Note Bell Aircraft employees cars parked in parking lot on left, also railroad underpass in back ground which is approximate westerly end of project.
Show less
- Title
- Burlington Streets: Lakeside Ave
- Description
-
December 11, 1945. City of Burlington, Vermont, Street Department Lakeside Ave. Pavement Base Construction This view was taken from a point near the intersection of Central Ave. looking easterly toward the underpass. Note that the temporary wearing surface had been constructed for the base after...
Show moreDecember 11, 1945. City of Burlington, Vermont, Street Department Lakeside Ave. Pavement Base Construction This view was taken from a point near the intersection of Central Ave. looking easterly toward the underpass. Note that the temporary wearing surface had been constructed for the base after the work of mixing and stabilizing the base had been completed as shown in the picture under date of Dec. 5, 1945. This stage of construction was done to enable the street to be used during the winter and early spring without experiencing the troubles of early spring break-up of the old dirt and cinder street. The pavement will be completed in the summer of 1946. Note the crushed stone base placed in the driveway after regrading to meet new grades. To the left in background is the Blodgett Co.
Show less
- Title
- Burlington Streets: Ledge Road
- Description
-
January 23, 1935. V.E.R.A. (Vermont Emergency Relief Administration) Sewer Project On upper end of Ledge Road at intersection of So. Prospect Street. Note the heavy rock excavation.
- Title
- Burlington Streets: Ledge Road
- Description
-
October 9, 1935 view of intersection of Route 7 (Shelburne Road or Street) and bottom of Ledge Road as it ascends up hill to the east. City street dept workmen do road or sewer construction. A dept. truck supplies power.
- Title
- Burlington Streets: Ledge Road
- Description
-
Dated photo may be Feb. 1935. V.E.R.A. Sewer Project. Looking East on Ledge Road. Note the amount of rock excavation and the old 8" sewer pipe which is to be replaced with 15" pipe.
- Title
- Burlington Streets: Locust St.
- Description
-
Undated view of Locust Street. May be 1930s sidewalk construction project by city street dept.
- Title
- Burlington Streets: Locust St.
- Description
-
Undated photo but may be 1930s road construction by city street dept. A portion of the road has been dug up.
- Title
- Burlington Streets: Locust St.
- Description
-
May 8, 1939. Locust Street, WPA Project No. 665-12-1-38 looking easterly from Pine Street while constructing telford base and sidewalk filling.
- Title
- Burlington Streets: Main Street (4X5's)
- Description
-
Mar. 18, 1940. This view shows the Snow King Rotary Snow Plow in section mounted on the front of the Street Department's Walter's Snow Fighter Truck in front of the Post Office on Main Street. Note the discharge spout delivering snow over the high side boards of the five cubic yard truck. This...
Show moreMar. 18, 1940. This view shows the Snow King Rotary Snow Plow in section mounted on the front of the Street Department's Walter's Snow Fighter Truck in front of the Post Office on Main Street. Note the discharge spout delivering snow over the high side boards of the five cubic yard truck. This loader is capable of loading a five cubic yard load in less than one-half minutes and has frequently loaded one hundred-five cubic yard truck loads of new fallen snow in approximately one and one-half hours working time including delays because of traffic and street intersections clean up.
Show less
- Title
- Burlington Streets: Main Street (4X5's)
- Description
-
March 18, 1940 late winter view of Main Street in front of the Strong Theatre building. The Snow King Rotary Snow Plow is mounted on the city street dept Walter's Snow Fighter Truck as it performs snow removal. Note the movie marque at the Strong, "The Marines Fly High" starring Richard Dix and...
Show moreMarch 18, 1940 late winter view of Main Street in front of the Strong Theatre building. The Snow King Rotary Snow Plow is mounted on the city street dept Walter's Snow Fighter Truck as it performs snow removal. Note the movie marque at the Strong, "The Marines Fly High" starring Richard Dix and Chester Morris.
Show less
- Title
- Burlington Streets: Main Street (4X5's)
- Description
-
Undated (may be late 1920s or early 1930s) overhead view of the continuation of asphalt application over the old brick pavement on Main Street between South Winooski Ave. and Church Street. Note the old trolley car tracks which are being covered up. Cable wires are still strung and barely visible...
Show moreUndated (may be late 1920s or early 1930s) overhead view of the continuation of asphalt application over the old brick pavement on Main Street between South Winooski Ave. and Church Street. Note the old trolley car tracks which are being covered up. Cable wires are still strung and barely visible overhead. On the right is the Post Office. Further up the street is the Strong Theatre building.
Show less