Search results
(1 - 12 of 12)
- Title
- Burlington Street Department Buildings - Equipment
- Description
-
Dec. 13, 1937. Snow plow in operation, possibly at the Burlington Airport.
- Title
- Burlington Street Department Buildings - Equipment
- Description
-
Undated photograph. Original caption reads: "Sno-go Rotary Snow Plow and Blower shown in a demonstration at the City of Burlington's Street Department, Central Plant, located at Pine Street."
- Title
- Burlington Street Department Buildings - Equipment
- Description
-
Undated but may be 1940 photo taken at the Burlington Street Dept's plant of the Walter Snow Fighter Truck with snow blower equipment attachment, Snow King Rotary Plow.
- Title
- Burlington Street Department Buildings - Equipment
- Description
-
Undated photograph of a snow plow in operation, possibly at the Burlington Airport. Embossed with McAllister name and Burlington, Vt.
- Title
- Burlington Street Department Buildings - Equipment
- Description
-
1930s or 1940s photograph of a Burlington Street Dept. snow plow/blower (front view)
- Title
- Burlington Street Department Buildings - Equipment
- Description
-
1930s or 1940s photo of Burlington Street Dept. snow plow (?) vehicle.
- Title
- Burlington Street Department Buildings - Equipment
- Description
-
1930s or 1940s photograph of a Burlington Street Dept. snow plow/blower (side view)
- Title
- Burlington Street Department Buildings - Equipment
- Description
-
1930s or 1940s photograph of a Burlington Street Dept. snow plow/blower
- Title
- Burlington Street Department Buildings - Equipment (4X5)
- Description
-
Photograph dated Feb. 22, 1940. Original caption reads: "The Snow King Rotary Plow operated by the Walter Snow Fighter Truck blowing heavy frozen snow on the shoulder of the Burlington Municipal Airport runways. Both the north-south and the east-west runways were opened for a width of 250 feet...
Show morePhotograph dated Feb. 22, 1940. Original caption reads: "The Snow King Rotary Plow operated by the Walter Snow Fighter Truck blowing heavy frozen snow on the shoulder of the Burlington Municipal Airport runways. Both the north-south and the east-west runways were opened for a width of 250 feet and for a length of 3,600 feet after each storm, the snow being plowed back into windrows from which it is blown as seen in the picture. A total of sixty-six hours work with the Rotary Plow was necessary to dispose of the entire amount of snow accumulated on the two runways, taxi-strip and hangar areas over the period from February 11, 1940 to February 22, 1940, inclusive, during which time the Weather Bureau reported a total snow fall of 11.8 inches, some of which was combined with several hours of rain and a lowering of the temperature to sub-zero weather.
Show less
- Title
- Burlington Streets: Winooski Ave.
- Description
-
February 20, 1944. This view taken on So. Winooski Ave near the First Congregational Church shows the Snow King Rotary Snow Loader mounted on Walter Snow Fighter truck loading snow from the street into a 10 cubic yard truck body. One of these truck loads is approximately 3/4 of a minute. An...
Show moreFebruary 20, 1944. This view taken on So. Winooski Ave near the First Congregational Church shows the Snow King Rotary Snow Loader mounted on Walter Snow Fighter truck loading snow from the street into a 10 cubic yard truck body. One of these truck loads is approximately 3/4 of a minute. An average fall of 6 inches of snow will require the hauling of approximately 250 loads of snow from the business streets.
Show less
- Title
- Burlington Streets: Winooski Ave.
- Description
-
February 20, 1944. This view taken near the intersection of Pearl Street shows the Snow King Rotary Plow loading snow from So. Winooski Ave. into truck which hauled the snow to the dumping area at the foot of College St. Each load contained approximately 10 cubic yards when piled high above the...
Show moreFebruary 20, 1944. This view taken near the intersection of Pearl Street shows the Snow King Rotary Plow loading snow from So. Winooski Ave. into truck which hauled the snow to the dumping area at the foot of College St. Each load contained approximately 10 cubic yards when piled high above the cab as shown in this picture. Buildings seen in the background run along Pearl Street going east.
Show less
- Title
- Burlington Streets: Winooski Ave.
- Description
-
February 20, 1944. This view shows the Snow King Rotary Plow loading snow from So. Winooski Ave. into truck which hauled the snow to the dumping area at the foot of College St. Each load contained approximately 10 cubic yards when piled high above the cab as shown in this picture.