Search results
(341 - 352 of 352)
Pages
- Title
- Vermont National Guard Hangar - Construction (Burlington Morrissey)
- Description
-
October 1947. Construction of the Vermont National Guard Hangar in Burlington showing the steel structure and workmen. Work by Wright & Morrissey Contractors of Burlington. Photo #5.
- Title
- Vermont National Guard Hangar - Construction (Burlington Morrissey)
- Description
-
October 1947. Construction of the Vermont National Guard Hangar in Burlington showing the steel arches and workmen. Work by Wright & Morrissey Contractors of Burlington
- Title
- Winooski Bridge
- Description
-
August 24, 1945. This view was taken from the Burlington end of the bridge looking northerly. Note the asphalt construction crew placing the 2 inch hot plant mix asphalt wearing surface on the westerly half of the bridge while the other half is being used for two way traffic. This wearing surface...
Show moreAugust 24, 1945. This view was taken from the Burlington end of the bridge looking northerly. Note the asphalt construction crew placing the 2 inch hot plant mix asphalt wearing surface on the westerly half of the bridge while the other half is being used for two way traffic. This wearing surface was placed 2 inches in thickness and tapered off on to the approaches at each end. The cost of this work was borne by the City of Winooski and City of Burlington sharing in the proportion of the grand list of each City and the State Highway Department. The State Highway Department paid for 4/5 of the total cost while the other fifth was divided between the two cities.
Show less
- Title
- Winooski Bridge
- Description
-
August 24, 1945. This view was taken from the Winooski end of the bridge looking toward Colchester Ave. hill. Note the completed hot plant mix wearing surface on the right half of the bridge (asphalt spreader and roller shown in the distance) while two way traffic is suing the left half of the...
Show moreAugust 24, 1945. This view was taken from the Winooski end of the bridge looking toward Colchester Ave. hill. Note the completed hot plant mix wearing surface on the right half of the bridge (asphalt spreader and roller shown in the distance) while two way traffic is suing the left half of the bridge. The crew in the left foreground is removing the old cold-patch aprons which were temporarily placed near the newly installed steel expansion lanes during the previous season. This wearing surface was placed 2 inches in thickness and tapered off on to the approaches at each end. The cost of this work was borne by the City of Winooski and City of Burlington sharing in the proportion of the grand list of each City and the State Highway Department. The State Highway Department paid for 4/5 of the total cost while the other fifth was divided between the two cities.
Show less
- Title
- Winooski Bridge
- Description
-
June 3, 1943. This view shows a close-up of the "A" frame and special attachment for a "rolling pull". In removing the (trolley track) rails on this project without the aid of a cutting torch and with very little damage to the pavement.
- Title
- Winooski Bridge Construction
- Description
-
July 5, 1928. Construction workers rebuild the Winooski Bridge that had been destroyed in the 1927 flood. View is looking up Colchester Ave. on the Burlington side.
- Title
- Winooski Bridge Construction
- Description
-
July 3, 1928. Construction workers seen on the steel beams during the construction of the Winooski Bridge. It was destroyed in the 1927 flood and reopened in August 1928.
- Title
- Winooski Bridge Construction
- Description
-
July 7, 1928. 5 P.M. Construction workers rebuild the Winooski Bridge connecting Burlington and Winooki over the Winooski River. View is looking toward Winooski.
- Title
- Winooski Bridge Construction (4X5's)
- Description
-
July 5, 1928. Workmen continue construction on the Winooski bridge smoothing the pavement surface. View is looking up Colchester Ave on the Burlington side. Photo No. 10
- Title
- Winooski Bridge Construction (4X5's)
- Description
-
July 3, 1928. Rebar is in place as construction of the new Winooski Bridge continues throughout the summer. View is looking toward Winooski.
- Title
- Winooski Bridge Repair
- Description
-
June 2, 1943. On the Winooski Bridge under repair. Champlain Mill to the right. View toward Winooski.
- Title
- Winooski Bridge Repair
- Description
-
August 24, 1945. On the Winooski Bridge with view toward Burlington and Colchester Ave. Trucks and workmen doing repair. See also mcalB22F18i01 taken moments apart from this image.