Search results
(261 - 280 of 1,094)
Pages
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
December 9, 1942. Hayward Street Looking Northerly from the Intersection of Catherine Street. This view shows Hayward Street looking northerly from the intersection of Catherine Street. Note that the new concrete curbs have been completed, the telford stone base has also been completed and the...
Show moreDecember 9, 1942. Hayward Street Looking Northerly from the Intersection of Catherine Street. This view shows Hayward Street looking northerly from the intersection of Catherine Street. Note that the new concrete curbs have been completed, the telford stone base has also been completed and the penetration binder course of crushed stone is now being layed preparatory to penetrating with asphalt.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
March 1, 1934. South Park at Hayward Street sewer project, Burlington, Vt. Men stand in a ditch with pick axes raised. A chain link fence runs across the path of the ditch. This picture shows a section of sewer trench leading to its junction with main leading from Shelburne Street where the flow...
Show moreMarch 1, 1934. South Park at Hayward Street sewer project, Burlington, Vt. Men stand in a ditch with pick axes raised. A chain link fence runs across the path of the ditch. This picture shows a section of sewer trench leading to its junction with main leading from Shelburne Street where the flow was diverted into new system. Done under P.W.A. sewer Docket No. 2353. Note heavy clay soil.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
January 12, 1942 Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins...
Show moreJanuary 12, 1942 Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
January 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins...
Show moreJanuary 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
April 13, 1934. P.W.A. Sewer Project No. 2353. South Park. A section of Hayward Street sewer looking north and after backfill is nearing completion. Note wet condition of terrain which necessitated pumping during excavation preceding the laying of the tile and the addition of a 6" sand cushion...
Show moreApril 13, 1934. P.W.A. Sewer Project No. 2353. South Park. A section of Hayward Street sewer looking north and after backfill is nearing completion. Note wet condition of terrain which necessitated pumping during excavation preceding the laying of the tile and the addition of a 6" sand cushion under tile.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
March 1, 1934. South Park & Hayward Street sewer project P.W.A. Docket no. 2353, Burlington, Vt. View of the trench.
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
January 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins...
Show moreJanuary 12, 1942. Hayward Street Improvements: This view shows the drop-hammer weighing approximately 1 1/2 tons being operated by the crane to break through the frost in place of compressor and paving breakers. W.C. Kirby's power-shovel is loading the material into trucks. Three new catch basins were constructed on this intersection to replace the old one.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
April 13, 1934. P.W.A. Sewer Project Docket No. 2353. South Park. A section of Hayward Street sewer looking south showing manhole in center of section which was of unusual construction due to ravine intersection with sewer main.
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
January 24, 1942. Hayward Street Improvements: This view shows the application of the hot asphalt emulsion being applied into the stone base or binder course. This binder course is approximately two inches in thickness and is laid on top of the eight inch telford stone base which is constructed...
Show moreJanuary 24, 1942. Hayward Street Improvements: This view shows the application of the hot asphalt emulsion being applied into the stone base or binder course. This binder course is approximately two inches in thickness and is laid on top of the eight inch telford stone base which is constructed on a six inch sand cushion. Note the old concrete curbs on the east side of the street and the absence of the curbs on the west side of the street where the undertile drain has been constructed. New integral concrete curb and gutter will be constructed in the spring.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
April 13, 1934. P.W.A. Sewer Project Docket No. 2353. South Park This view shows a section of Hayward Street Sewer looking north. Note unusual height of manhole construction occasioned by ravine intersecting sewer main at this point. This manhole was reinforced and protected on both sides by...
Show moreApril 13, 1934. P.W.A. Sewer Project Docket No. 2353. South Park This view shows a section of Hayward Street Sewer looking north. Note unusual height of manhole construction occasioned by ravine intersecting sewer main at this point. This manhole was reinforced and protected on both sides by cribbing made of old railroad ties and anchored with rubble and extra fill from sewer trench.
Show less
- Title
- Burlington Streets: Hayward St. & Hayward St. Sewer
- Description
-
December 12, 1942. Hayward Street Looking Northerly from Catherine Street. This view shows Hayward street looking northerly from Catherine Street after the binder course of asphalt penetration macadam had been completed and the 2 inch asphalt hot plant mix wearing surface was being constructed....
Show moreDecember 12, 1942. Hayward Street Looking Northerly from Catherine Street. This view shows Hayward street looking northerly from Catherine Street after the binder course of asphalt penetration macadam had been completed and the 2 inch asphalt hot plant mix wearing surface was being constructed. Note the date of this picture, Dec 12, which is probably the latest date at which asphalt pavement construction of this type has ever been attempted in Vermont.
Show less
- Title
- Burlington Streets: Home Ave.
- Description
-
May 2, 1934. South End P.W.A. Sewer Project Docket No. 2353 A Section of Home Avenue near Wells Street. Note that ledge is encountered the entire depth from ground level to grade of sewer. The truck appears to contain the power source via tubing for the hand-held jack hammer one of the workmen...
Show moreMay 2, 1934. South End P.W.A. Sewer Project Docket No. 2353 A Section of Home Avenue near Wells Street. Note that ledge is encountered the entire depth from ground level to grade of sewer. The truck appears to contain the power source via tubing for the hand-held jack hammer one of the workmen holds.
Show less
- Title
- Burlington Streets: Home Ave.
- Description
-
April 14, 1934. Photo #13. City of Burlington, Vermont Federal Project P.W.A. Sewer Project No. 2353. Sewer construction - Home Ave. looking East from intersection of Richardson St. showing rock excavation. Note number of boulders encountered in this section in addition to ledge. The trench has...
Show moreApril 14, 1934. Photo #13. City of Burlington, Vermont Federal Project P.W.A. Sewer Project No. 2353. Sewer construction - Home Ave. looking East from intersection of Richardson St. showing rock excavation. Note number of boulders encountered in this section in addition to ledge. The trench has standing water in it as the men do their work. Black metal lunch boxes are gathered on some of the boulders on the right. Dirt roads still evident in mud season.
Show less
- Title
- Burlington Streets: Home Ave.
- Description
-
April 20, 1934. P.W.A. South End Sewer P.W. A. Project No. 2353 A Section of Home Avenue looking west from Wells Street. In this section, solid ledge was encountered most of the way. A wooden sign states "Federal Public Works Project No. 2353" Men work in and above the trench.
- Title
- Burlington Streets: Howard St.
- Description
-
November 9, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Hayward Street looking westerly. Note the new concrete sidewalk on north side and new integral concrete curbs and gutters on both sides of pavement. The Hot Plant Mix Asphalt Wearing Surface...
Show moreNovember 9, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Hayward Street looking westerly. Note the new concrete sidewalk on north side and new integral concrete curbs and gutters on both sides of pavement. The Hot Plant Mix Asphalt Wearing Surface was just bieng completed when this picture was taken. Grading between curb and sidewalk on North Side and in back of curb on South side was completed the following day after picture was taken. The 2 inch asphalt wearing surface was placed on a 3 inch penetration macadam with an 8 inch telford stone base. Drainage tile was laid the entire length of the street on the rear of the curbs on either side and in the center line of the street. All tile was drained with catch basins and manholes.
Show less
- Title
- Burlington Streets: Howard St.
- Description
-
July 26, 1945. Howard Street Pavement Project. This view was taken at the intersection of Hayward Street looking westerly shows the condition of the upper half of the old street surface, also the condition of old curb and gutter and sidewalk on the northerly side before excavation work was done....
Show moreJuly 26, 1945. Howard Street Pavement Project. This view was taken at the intersection of Hayward Street looking westerly shows the condition of the upper half of the old street surface, also the condition of old curb and gutter and sidewalk on the northerly side before excavation work was done. More info can be found on UVM's Historic Burlington Project, Burlinton, Vermont, (South of Pearl Street photographs from 1930s 1940s)
Show less
- Title
- Burlington Streets: Howard St.
- Description
-
July 26, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly shows the excavation being made to receive the sand cushion and telford stone base. Note the condition of the old curb and gutter and sidewalk on the northerly side...
Show moreJuly 26, 1945. Howard Street Pavement and Sidewalk Project. This view was taken at the intersection of Pine Street looking easterly shows the excavation being made to receive the sand cushion and telford stone base. Note the condition of the old curb and gutter and sidewalk on the northerly side of the street, and the undertile drain being laid in the center of the street near the power shovel. Undertile drainage was also laid on both sides of the street back of the curb to provide proper drainage. The sub-base was soft blue clay and very unstable and full of moisture. It was necessary to stabilize this sub-base by mixing a layer of sand with the clay and treating with asphalt emulsion before the sand cushion and Telford Base could be placed as trucks could not pass over the base with a load of material without getting stuck.
Show less
- Title
- Burlington Streets: Institute Road
- Description
-
February 11, 1946 Institute Road - Road Excavation and Street Widening Project This view was taken from a point on Institute Road near the gate leading to Bishop Hopkins Hall looking easterly toward North Ave. The rock excavation to be removed can be seen in the south portion of the highway. Note...
Show moreFebruary 11, 1946 Institute Road - Road Excavation and Street Widening Project This view was taken from a point on Institute Road near the gate leading to Bishop Hopkins Hall looking easterly toward North Ave. The rock excavation to be removed can be seen in the south portion of the highway. Note the rock also on the north side of the road which should be removed in order to develop the street for its full width. An appropriation of $2500.00 was made by the Board of Aldermen to pay for the cost of removing the rock excavation. The appropriation was made to the Park Department and the work is to be done by the Street Department. This appropriation covers only the estimated cost of rock excavation and depositing this extra rock for fill on the shoulder of the road where the street is to be widened by filling. An appropriation will have to be made later if this work is to be done.
Show less
- Title
- Burlington Streets: Institute Road
- Description
-
October 7, 1946 Institute Road Rock Excavation Street Widening Project showing new sidewalk construction work done by the city street dept.
- Title
- Burlington Streets: Institute Road
- Description
-
March 22, 1946 Institute Road - Rock Excavation Street Widening Project. This view shows the shoulder work and widening being done by the use of the rock excavation from this job.