Louis L. McAllister Photographs
Collection Overview
Louis L. McAllister photographed people and places near Burlington, Vermont for 60 years. He was born in Columbus, Nebraska on October 16, 1876, the son of Julius S. McAllister (born 1841 in Lincoln, VT) and Rosette Gould (born in Vermont in 1851)...
Show moreLouis L. McAllister photographed people and places near Burlington, Vermont for 60 years. He was born in Columbus, Nebraska on October 16, 1876, the son of Julius S. McAllister (born 1841 in Lincoln, VT) and Rosette Gould (born in Vermont in 1851). Julius McAllister worked as a photographer and dentist in Washington D.C., Bristol, Vermont and Columbus, Nebraska. Around 1895, Julius, his third wife Amy, and their children left Nebraska for the Union Soldiers’ Colony in Fitzgerald, Georgia. By 1900, Julius and Amy were divorced, and Amy and her stepson Louis were working as photographers in Thomasville, Georgia.
In 1907 Louis McAllister married Cora Shepard (born about 1872 in Vermont) in Holland, Michigan. By 1910, they were living in Queen City Park in South Burlington, Vermont, where Louis established a photography studio. The McAllisters moved to Burlington, and by 1919 they lived at 47 N. Winooski Avenue. They continued to occupy a summer cottage at Queen City Park, and were active in the Queen City Park Association, which held spiritualist camp meetings annually. McAllister conducted his photography business from home until his death in 1963.
McAllister’s “trademark” was his panorama camera which made him familiar to all sorts of groups ranging from graduating classes to state police to summer camp groups. In addition he did print 8 x 10 photos, many of which document building construction and Burlington Street Department projects, as well as group and individual portraits.
The L.L. McAllister Collection includes portraits, construction projects, buildings, businesses and events in the Burlington area covering the period ca. 1920-1960. The collection also includes photos of street, bridge, airport and sewer construction and repair, as well as group portraits of clubs, schools, etc.
Revised April, 2010
Show less
Related Archival Collection
Pages
- Title
- Burlington Streets: College Street
- Date Created
- 1929-10-19
- Description
-
1929 dated photo. College Street looking east from South Winooski Ave. as the construction gang were completing the construction of the concrete base near South Union Street. Note gutter forms in place ready to receive the concrete. 2" strips are used for the forms to allow for the 2" Asphalt...
Show more1929 dated photo. College Street looking east from South Winooski Ave. as the construction gang were completing the construction of the concrete base near South Union Street. Note gutter forms in place ready to receive the concrete. 2" strips are used for the forms to allow for the 2" Asphalt pavement which will be constructed on the concrete base. Seen on the right in the background is College Street Congregational Church.
Show less
- Title
- Burlington Streets: College Street
- Date Created
- 1941-03-28
- Description
-
Mar. 28, 1941 dated photo. View of sewer construction on College Street looking westerly from South Prospect Street in front of the University of Vermont's new Waterman Memorial Building. The Street Department's Universal Crane can be seen in the distance handling excavation with the clamshell...
Show moreMar. 28, 1941 dated photo. View of sewer construction on College Street looking westerly from South Prospect Street in front of the University of Vermont's new Waterman Memorial Building. The Street Department's Universal Crane can be seen in the distance handling excavation with the clamshell bucket and lowering tile into the trench. Elm trees line the street.
Show less
- Title
- Burlington Streets: College Street
- Date Created
- 1929-08-25
- Description
-
Aug. 25, 1929 dated photo. Burlington Street Dept crew pouring concrete base on College Street in front of New England Telephone & Telegraph Company Office Building, 260 College. Construction vehicles and bags of paving materials on wooden pallets.
- Title
- Burlington Streets: College Street
- Date Created
- undated
- Description
-
Undated view of St Paul Street at the intersection of College Street. Construction workers lay asphalt resurfacing the street. Steam roller seen to the right. Also to the right is City Hall Park. Howard Bank building behind the workers at the intersection. Also seen on College St. is T.S. Peck...
Show moreUndated view of St Paul Street at the intersection of College Street. Construction workers lay asphalt resurfacing the street. Steam roller seen to the right. Also to the right is City Hall Park. Howard Bank building behind the workers at the intersection. Also seen on College St. is T.S. Peck Insurance Agency, E S Adsit Coal Co.
Show less
- Title
- Burlington Streets: College Street
- Date Created
- 1929-10-19
- Description
-
Aug 25, 1929 dated photo. Pouring concrete base on College Street in front of College Street Congregational Church. Note the construction of the base showing dowels spaced 5' on centers. This concrete base was constructed in 3--10' slabs 6" in thickness with 30" gutters on either sides extending...
Show moreAug 25, 1929 dated photo. Pouring concrete base on College Street in front of College Street Congregational Church. Note the construction of the base showing dowels spaced 5' on centers. This concrete base was constructed in 3--10' slabs 6" in thickness with 30" gutters on either sides extending 2" above the concrete base allowing for the surface coarse of Asphalt 2" in thickness. This work is all done by City labor and City equipment of the Burlington Street Dept. Fletcher Free Library can be seen in the background on the right.
Show less
- Title
- Burlington Streets: College Street (4X5)
- Date Created
- undated
- Description
-
1929 dated photo. College Street looking east from South Winooski Ave. as the construction gang were completing the construction of the concrete base near South Union Street. Note gutter forms in place ready to receive the concrete. 2" strips are used for the forms to allow for the 2" Asphalt...
Show more1929 dated photo. College Street looking east from South Winooski Ave. as the construction gang were completing the construction of the concrete base near South Union Street. Note gutter forms in place ready to receive the concrete. 2" strips are used for the forms to allow for the 2" Asphalt pavement which will be constructed on the concrete base. Seen on the right in the background is College Street Congregational Church.
Show less
- Title
- Burlington Streets: DeForest Road
- Date Created
- 1935-11-19
- Description
-
Soil Stabilization by A.M. Bitumuls Co. Bitumulus Stabilizer being used on DeForest Road.
- Title
- Burlington Streets: DeForest Road
- Date Created
- 1932-07-13
- Description
-
July 13, 1932 dated photo. #3 DeForest St. 7-13-32. Looking easterly from Pine Grove toward Overlake Park before construction of Telford Stone Base.
- Title
- Burlington Streets: DeForest Road
- Date Created
- 1932-07-13
- Description
-
July 13, 1932 dated photo. #4 DeForest St. 7-13-32 Burlington Street Dept. crew repaving road surface. Looking south from South Willard Street intersection during construction of Telford Stone Base.
- Title
- Burlington Streets: DeForest Road
- Date Created
- 1932-07-13
- Description
-
July 13, 1932 dated photo. #1 Deforest St. 7-13-32. Crew and vehicles work with crushed stone. Looking north from Hairpin Curve during construction of Telford Stone Base.
- Title
- Burlington Streets: DeForest Road
- Date Created
- 1935-11-27
- Description
-
Nov. 27, 1935 dated photo. Deforest Road, Burlington, Vermont looking east from intersection of South Willard Street. Soil stabilization of base with Bitumuls Stabilizer having been completed and 2" armour coat being constructed.
- Title
- Burlington Streets: DeForest Road
- Date Created
- 1935-11-19
- Description
-
Soil Stabilization by A.M. Bitumuls Co. Bitumulus Stabilizer being used on DeForest Road.
- Title
- Burlington Streets: DeForest Road
- Date Created
- 1935-11-19
- Description
-
Nov. 19, 1935 dated photo. Soil Stabilization by A.M. Bitumuls Co. Bitumuls Stabilizer being used on DeForest Road.
- Title
- Burlington Streets: DeForest Road
- Date Created
- 1935-11-19
- Description
-
Nov. 19, 1935 dated photo. Soil Stabilization by A.M. Bitumuls Co. Bitumulus Stabilizer being used on DeForest Road.
- Title
- Burlington Streets: DeForest Road
- Date Created
- 1932-07-13
- Description
-
July 13, 1932 dated photo. #3 DeForest St. 7-13-32. Looking easterly from Pine Grove toward Overlake Park before construction of Telford Stone Base.
- Title
- Burlington Streets: DeForest Road
- Date Created
- 1935-11-19
- Description
-
Nov. 19, 1935 dated photo. Soil Stabilization by A.M. Bitumuls Co. Bitumuls Stabilizer being used on DeForest Road.
- Title
- Burlington Streets: DeForest Road (4X5)
- Date Created
- 1935-11-27
- Description
-
Nov. 27, 1935 dated photo. Deforest Road, Burlington, Vermont looking west from intersection of Overlake Park showing surface of street after soil stabilization work with Birumuls Stabilizer had been completed for base and one course armour coat asphalt penetration of 2" thickness had been...
Show moreNov. 27, 1935 dated photo. Deforest Road, Burlington, Vermont looking west from intersection of Overlake Park showing surface of street after soil stabilization work with Birumuls Stabilizer had been completed for base and one course armour coat asphalt penetration of 2" thickness had been completed. Seal coat delayed until season 1936 because of cold weather. Note parking area between curb and sidewalk being cleaned and rubbish raked into gutter before final clean up job.
Show less
- Title
- Burlington Streets: DeForest Road (4X5)
- Date Created
- 1932-10-29
- Description
-
Oct. 29, 1932 dated photo. #10 DeForest Road. Looking North from Hairpin Curve after Telford Base Construction - Salvaged Macadam Surface.
- Title
- Burlington Streets: DeForest Road (4X5)
- Date Created
- 1932-10-29
- Description
-
Oct. 29, 1932 dated photo. #11 DeForest St. 10-29-32 Looking easterly from Pine Grove toward Overlake Park after Telford Stone Base Constructed - Salvaged Macadam Surface.
- Title
- Burlington Streets: East Ave.
- Date Created
- 1938-02-26
- Description
-
Feb. 26, 1938 dated photo. East Avenue from near Colchester Avenue looking South, WPA (Work Projects Administration) Project No. 65-12-336. This view shows the widening project carried on during the winter months. This street was widened to a total width of thirty feet and a slope of 1 -1 1/2 was...
Show moreFeb. 26, 1938 dated photo. East Avenue from near Colchester Avenue looking South, WPA (Work Projects Administration) Project No. 65-12-336. This view shows the widening project carried on during the winter months. This street was widened to a total width of thirty feet and a slope of 1 -1 1/2 was given to the shoulders. The old power line was reconstructed with new poles and fixtures and placed in a position to allow for future development. Another project is being prepared for future development of a new pavement and further widening at the south end of this street.
Show less